M4 Project NSW.
- Prefab 6000+ tons of Pile and D-Wall cages
- Prefab 1200t of 2.4m-2.7m dia oversized pile and column cages
- Prefab 48,000 lig slices for CPB pre-cast girder yard.
- Design and build I-Beam girder jigs.
- Take over all steelfixing works in CPB pre-cast girder yard.
- 45 employees at peak production.
- All welding and Lifting design supplied