M4 Project NSW

 

M4 Project NSW.

  • Prefab 6000+ tons of Pile and D-Wall cages
  • Prefab 1200t of 2.4m-2.7m dia oversized pile and column cages
  • Prefab 48,000 lig slices for CPB pre-cast girder yard.
  • Design and build I-Beam girder jigs.
  • Take over all steelfixing works in CPB pre-cast girder yard.
  • 45 employees at peak production.
  • All welding and Lifting design supplied